|
| Proc No |
Description |
Technical Evaluation Detail |
| |
|
 |
PROC-FE/CB/EXPL/QC-646/2012
|
|
PROVISION OF SOFTWARE & HARDWARE FOR ON-SITE SEISMIC DATA PROCESSING SYSTEMS |
|
TE Details |
 |
PROC-FB/CB/PROD-731/2012(Revised Date of Opening)
|
|
8” SEAMLESS PIPELINE. |
|
TE Details |
 |
PROC-FD/CB/WS-768/2013
|
|
HIRING OF ACIDIZATION SERVICES TO RELEASE THE STUCK STRING FOR ALL OGDCL RIGS/FIELDS/WELLS UNDER RATE RUNNING CONTRACT ON AS AND WHEN REQUIRED BASIS FOR A PERIOD OF TWO (02) YEARS |
|
TE Details |
 |
PROC-FE/CB/ECMP-0643/2012
|
|
MULTI GEO PHONE STRINGS AND SPARES |
|
TE Details |
 |
PROC-FC/CB/PROJ-614/2012
|
|
DESIGN, MANUFACTURING, TESTING, INSPECTION AND SUPPLY OF SLOP PUMPS |
|
TE Details |
 |
PROC-FE/CB/PROD-716/2012
|
|
SPECTROPHOTOMETER |
|
TE Details |
 |
Proc-FC/CB/PROJ-604/2012 (Re-Revised-Date of Opening)
|
|
Supply and Commissioning of Centrifugal Sale Gas Compressor Package |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0389/2012
|
|
SPARES FOR AUXILIARY AIR COOLERS. |
|
TE Details |
 |
PROC-FD/CB/PROJ-0703/2012.
|
|
Procurement (Supply), Construction, Installation/Erection, Pre-Commissioning, & Commissioning for Wellhead Facility & Flowlines. |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-634/2012
|
|
PRESSURE/TEMPERATURE INDICATOR/LEVEL GAUGES |
|
TE Details |
 |
PROC-FC-CB-PROJ-652-2012
|
|
SUPPLY OF CONTROL VALVES &
PRESSURE REGULATORS
|
|
TE Details |
 |
PROC-FC/CB/PROJ-548/12
|
|
SUPPLY OF FLOW LINES MATERIAL (GROUP A: LINE PIPE & GROUP B: BENDS, FLANGES & OTHERS ETC) |
|
TE Details |
 |
PROC-FC/CB/PROJ-616/2012
|
|
DESIGN, MANUFACTURING, SUPPLY &
COMMISSIONING OF HOT OIL PACKAGE |
|
TE Details |
 |
PROC-FD/CB/ML-758/2013
|
|
ACQUIRING OF MUD LOGGING SERVICES ON RATE RUNNING CONTRACT |
|
TE Details |
 |
PROC-FE/CB/P&P/QP-647/2012
|
|
OIL LEVEL SWITCH, REPAIR KIT & PRESSURE TRANSMITTERS |
|
TE Details |
 |
PROC-FC/CB/PROJ/ INJ-624/2012
|
|
CONTROL VALVES |
|
TE Details |
 |
PROC-FE/CB/M-LOGG/0668/2012
|
|
MUD LOGGING SENSORS & SPARES |
|
TE Details |
 |
PROC-FA/CB/P&P/CHEM-648/2012
|
|
MONO ETHYLENE GLYCOL (MEG) |
|
TE Details |
 |
PROC-FB/CB/D-662/2012
|
|
30” CONDUCTOR PIPES |
|
TE Details |
 |
PROC-FA/CB/DRG/PUMP-660/2012
|
|
SPARES FOR MUD PUMP F-1300 |
|
TE Details |
 |
PROC-FC-CB-PROJ-637-2012
|
|
SUPPLY OF POWER, CONTROL & EARTHING
CABLES
|
|
TE Details |
 |
PROC-FA/CB/ENGG-699/2012
|
|
ELECTRIC GENERATOR 300 KVA |
|
TE Details |
 |
PROC-FE/CB/PROD-712/2012
|
|
30 TONS HYDRAULIC CRANE |
|
TE Details |
 |
PROC-FB/CB/PROD-641/2012
|
|
4-1/2” 12.6 LBS/FT TTUBING, PUP
JOINTS & X-OVERS |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-680/2012
|
|
XANTHAN GUM POWDER |
|
TE Details |
 |
PROC-FB/CB/PROD-670/2012
|
|
6” PIPELINE FOR MARU RETI |
|
TE Details |
 |
PROC/FC/CB/PROJ-561/I2
|
|
Supply of Lightening Material, junction, boxes, Motor control station & cable gland |
|
TE Details |
 |
PROC-FB/CB/PROD-665/2012
|
|
TUBING HEAD & X-MASS TREE ASSEMBLY 4-1/16” 5000 PSI WP |
|
TE Details |
 |
PROC-FB/CB/PROD-666/2012
|
|
HYDRAULIC SET, PERMANENT SEAL BORE PACKERS FOR 7” 26—30 PPF CASING, 10,000 PSI DIFFERENTIAL PRESSURE RATING, 300°F TEMP. RATING ALONG WITH TRSCSSV & ACCESSORIES |
|
TE Details |
 |
PROC-FA/CB/PROD/ENGINE-0429/2012
|
|
DIESEL ENGINE DRIVE GEN. SET CAPACITY 30 KVA |
|
TE Details |
 |
PROC-FD/CB/CS-767/2013 .
|
|
HIRING OF SERVICES OF SHARE REGISTRAR/TRANSFER AGENT. |
|
TE Details |
 |
Proj-FC/CB/Proj-577/2012
|
|
Design, Fabrication, Supply, Installation Supervision, Complete Testing and commissioning of Step Down Transformers |
|
TE Details |
 |
PROC-FD/CB/PROJ-0704/2012
|
|
Hiring the services of Contractor for Construction,Installation/Erection, Pre - Commissioning, & Commissioning Assistance of Gas Processing Facilities. |
|
TE Details |
 |
PROC-FC/CB/PROJ-559/2012
|
|
Design, Manufacturing and Supply of Fuel Gas Electric Heater |
|
TE Details |
 |
PROC-FD/CB/DO-693/2012
|
|
HIRING OF DIRECTIONAL DRILLING SERVICES |
|
TE Details |
 |
PROC-FC/CB/SINJ-585/2012
|
|
SAFETY SYSTEM FOR SINJHORO |
|
TE Details |
 |
PROC-FB/CB/D-586/2012
|
|
9-7/8” FLOAT EQUIPMENT |
|
TE Details |
 |
PROC-FB/CB/D-629/2012
|
|
7” & 5” OD SEAMLESS STEEL CASING PIPES |
|
TE Details |
 |
PROC-FD/CB/HSEQ-710/2012
|
|
FIRE ALARM & DETECTION SYSTEM
FOR OGDCL HOUSE |
|
TE Details |
 |
PROC-FD/CB/WS-656/2012
|
|
HIRING OF MUD ENGINEERING SERVICES UNDER RATE RUNNING CONTRACT ON AS AND WHEN REQUIRED BASIS |
|
TE Details |
 |
PROC-FC/CB/PROJ-667/2012(Re-Revised Date of Opening
|
|
Design, Manufacturing, supply & Commissioning of Amine unit, LPG Unit, Condensate Stablization Unit. |
|
TE Details |
 |
PROC-FC/CB/PROJ/538/2012
|
|
Supply of Gas gathering Piping material |
|
TE Details |
 |
PROC-FA/CB/P&P/PUMP-590/2012
|
|
HP BOILER FEED WATER PUMP |
|
TE Details |
 |
TE NO. PROC/FC/CB/PROJ/534/2012
|
|
Supply of field instrument |
|
TE Details |
 |
PROC-FC/CB/PROJ- 613/2012
|
|
SUPPLY OF DOWTHERM-A OR EQUIVALENT FOR HOT OIL PACKAGE |
|
TE Details |
 |
PROC-FA/CB/P&P/CHEM-359/2012
|
|
HOT OIL |
|
TE Details |
 |
PROC-FB/CB/P&P-441/2012
|
|
VALVES FOR H2S REMOVAL PLANT & DE-HYDRATION PLANT |
|
TE Details |
 |
PROC-FB/CB/PROD-633/2012
|
|
PIPE FITTINGS |
|
TE Details |
 |
PROC-FB/CB/PROD-654/2012
|
|
GRAVEL PACK MATERIAL & SERVICES OF LSTK BASIS |
|
TE Details |
 |
PROC-FD/CB/SECURITY-707/2012
|
|
HIRING OF SECURITY SERVICES AT OGDCL’S MOVING & NON-MOVING LOCATIONS |
|
TE Details |
 |
PROC-FC/CB/PROJ-540/2012
|
|
Supply of Flow Lines, Valves, Flanges & Fittings. |
|
TE Details |
 |
PROC-FD/CB/DO-674/2012
|
|
HIRING OF WHIPSTOCK SERVICES |
|
TE Details |
 |
PROC-FD/CB/TAX&RM-661/12
|
|
HIRING OF SERVICES OF LIFE INSURANCE COMPANY FOR INSURANCE OF LOANS GRANTED TO OGDCL EMPLOYEES |
|
TE Details |
 |
PROC·FB/CB/D·583/2012
|
|
POC BITS & NOZZLES |
|
TE Details |
 |
PROC-FD/CB/D-673/2012
|
|
HIRING OF DRILLING JARS |
|
TE Details |
 |
PROC-FE/CB/PROD/NP-663/2012
|
|
INVITATION FOR BID FOR PROCUREMENT OF FORK LIFTERS |
|
TE Details |
 |
Proc FE/CB/RM-526/12
|
|
Tyres for 30 ton cranes & 8 ton Fork lifter |
|
TE Details |
 |
PROC-FB/CB/PROD-587/2012
|
|
PIPE VALVES |
|
TE Details |
 |
PROC-FC/CB/PROJ-558/2012
|
|
Design, Manufacturing complete testing and Supply of Pig Launcher & Receiver Package |
|
TE Details |
 |
PROC-FC/CB/PROJ-560/2012
|
|
Design, Manufacturing and Supply of Well Head Utility Gas and Corrosion Inhibition Package |
|
TE Details |
 |
PROC-FD/CB/AVIATION-672/2012
|
|
ACQUIRING OF AVIATION SERVICES FOR OGDCL |
|
TE Details |
 |
PROC-FC/CB/PROJ/512/2012
|
|
Design, Manufacturing complete testing and Supply of Separators & Pressure Vessels |
|
TE Details |
 |
PROC-FD/CB/ADMIN-658/2012
|
|
HIRING OF SERVICES FOR OPERATION & MAINTENANCE OF LIFTS/ELEVATORS AT OGDCL HOUSE |
|
TE Details |
 |
PROC-FC/CB/PROJ-610/2012
|
|
Supply of Instrument & Communication Cable, Cable Glands and Junction Boxes |
|
TE Details |
 |
Proj-FC/CB/Proj-576/2012
|
|
Supply of Lighting Material |
|
TE Details |
 |
PROC-FD/CB/JV-631/2012
|
|
TO HIRE SERVICES OF CONSULTANT FOR IDENTIFICATION AND VALUATION OF OIL COMPANY ACQUISITION |
|
TE Details |
 |
PROC-FC/CB/ PROJ/465-A/2012
|
|
DESIGN, MANUFACTURE, SUPPLY, COMPLETE TESTING AND COMMISSIONING OF UPS. |
|
TE Details |
 |
PROC-FD/CB/SECURITY-645/2012
|
|
HIRING OF SERVICES FOR INSTALLATION AND MAINTENANCE OF AN INTEGRATED ACCESS CONTROL SYSTEM AT OGDCL HOUSE |
|
TE Details |
 |
Proc-FC/CB/Proj-588/2012
|
|
Supply of Instrument Cables, Cables Glands and Junction Boxes |
|
TE Details |
 |
PROC-FC/CB/PROJ/514/2012
|
|
Design, Manufacturing and Supply of Automatic Back Wash & Multimedia Filters |
|
TE Details |
 |
PROC-FC/CB/PROJ/516/2012
|
|
Design, Manufacturing and Supply of Flare Package. |
|
TE Details |
 |
PROC-FD/LCB/MED-683/2012
|
|
HIRING OF SERVICES OF IN-HOUSE LABORATORIES FOR MEDICAL SERVICES DEPARTMENT |
|
TE Details |
 |
PROC-FB/CB/PROD-592/2012
|
|
FACTORY BENDS |
|
TE Details |
 |
PROC-FD/CB/D-602/2012
|
|
HIRING OF UNDER BALANCED DRILLING (UBD) SERVICES |
|
TE Details |
 |
PROC-FA/CB/PROD/ CHEM-640/2012
|
|
POUR POINT DEPRESSANT |
|
TE Details |
 |
PROC-FC/CB/P&P/ CHANDA-459/2012
|
|
AMINE SWEETENING UNIT |
|
TE Details |
 |
Proc FD/PQ/JV-630/2012
|
|
Expression of Interest for Pre-Qualification for Right to Participate in EOR/IOR and Revitalization of Mature Fields. |
|
TE Details |
 |
Proc-FD/CB/WS-0299/2011
|
|
Hiring of Cementing Services With Cement Slurries etc |
|
TE Details |
 |
Proc-FD/CB/WS-0298/2011
|
|
Hiring of Cementing Services With Cement Slurries |
|
TE Details |
 |
PROC-FC/CB/PROJ-612/2012
|
|
Supply of Earthing Material |
|
TE Details |
 |
PROC-FB/CB/PROD-567/2012
|
|
HEAT SHRINKABLE SLEEVES |
|
TE Details |
 |
PROC-FC/CB/PROJ-611/2012
|
|
Supply of Hookup Material |
|
TE Details |
 |
T.E No. PROC-FC/CB/PROJ·532/2012
|
|
SUPPLY OF CONTROL VALVES |
|
TE Details |
 |
PROC-FC/CB/PROJ/522/2012
|
|
Supply of De-Hydration Package |
|
TE Details |
 |
Proc FB/CB/PROD/505/12
|
|
Test Separators for well testing |
|
TE Details |
 |
PROC-FA/CB/PROD/ CHEM-622/2012
|
|
CORROSION INHIBITOR |
|
TE Details |
 |
PROC-FE/CB/PROD-448/2012
|
|
SALE GAS METERING SKID & ONLINE ANALYTICAL INSTRUMENTATION ANALYZERS |
|
TE Details |
 |
PROC-FC/CB/PROJ/ 517/2012
|
|
Supply of Scraper Launcher/Receivers |
|
TE Details |
 |
PROC-FC/CB/PROJ/521/2012
|
|
Supply of GaslOil Separator |
|
TE Details |
 |
PROC-FB/CB/PROD-568/2012
|
|
3-1/16" 10k X-MASS TREE (10 SET) |
|
TE Details |
 |
PROC-FE/CB/ECMP-393/2012
|
|
POWER GENERATING SETS |
|
TE Details |
 |
Proc-FC/CB/PROJ/497/2012
|
|
Supply of Wellhead Injection Packages |
|
TE Details |
 |
PROC-FB/CB/D-332/2011
|
|
LARGE BORE BOPs |
|
TE Details |
 |
Proc FC/CB/PROJ/443/2012
|
|
Water Treatment Package |
|
TE Details |
 |
PROC-FA/CB/PROD/ PUMP-494/2012
|
|
CRUDE DISPATCH PUMPS |
|
TE Details |
 |
TE. PROC-FC/CB/PROJ/533/2012
|
|
Design, Fabrications and supply of Filter separator |
|
TE Details |
 |
PROC-FC/CB/PROJ-524/2012
|
|
SUPPLY OF WELLHEAD CONTROL PANELS |
|
TE Details |
 |
PROC-FA/CB/P&P/KNR-528/2012
|
|
CHARCOAL FILTERS FOR KUNNAR |
|
TE Details |
 |
Proc-FC/CB/Proj-450/2012
|
|
Supply of Pressure Safety Valves |
|
TE Details |
 |
PROC-FA/CB/DRG-461/2012
|
|
CENTRIFUGE & SPARES |
|
TE Details |
 |
Proc FC/CB/SNJ-508/12
|
|
Wellhead material (pipes/valves/fittings) |
|
TE Details |
 |
PROC-FD/CB/ADMIN-563/2012
|
|
HIRING OF SERVICES FOR AUGMENTATION OF HVAC SYSTEM AT OGDCL HOUSE, ISLAMABAD |
|
TE Details |
 |
PROC-FE/CB/ECMP-411/2012
|
|
SURVEY EQUIPMENT GPS RTK |
|
TE Details |
 |
PROC-FA/CB/PROD/CBG-571/2012
|
|
DIESEL ENGINE DRIVEN GENSETS |
|
TE Details |
 |
PROC-FD/CB/DO-0565/2012
|
|
HIRING OF CORING SERVICES FOR SHALE GAS PROJECT |
|
TE Details |
 |
Proc FC/CB/PROJ/451/2012
|
|
UPS |
|
TE Details |
 |
PROC-FB/CB/DRM-436/2012
|
|
DRILL STRING & DOWN HOLE TOOLS (02 SETS) |
|
TE Details |
 |
PROC-FE/CB/PROD-509/2012
|
|
GAS CHROMATOGRAPH, MOISTURE ANALYZER & ELECTRONIC FLOW COMPUTER |
|
TE Details |
 |
PROC-FA/CB/PROD/ CHEM-490/2012
|
|
CASE FOR PROCUREMENT OF SCALE INHIBITOR |
|
TE Details |
 |
PROC-FB/CB/DRM-484/2012
|
|
SPARES FOR CROWN BLOCK |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-460/2012
|
|
OIL BASE MUD (OBM) CHEMICALS PACKAGE |
|
TE Details |
 |
PROC-FA/CB/PROD/ PUMP-500/2012
|
|
JET PUMPING UNITS |
|
TE Details |
 |
Proc FC/CB/PROJ/466
|
|
Supply line pipe 4",6" & 12" |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-0507/2012
|
|
CARBOXY METHYL CELLULOSE HIGH VISCOSITY (CMC-HV) |
|
TE Details |
 |
PROC-FB/CB/PROD-519/2012
|
|
FACTORY BENDS |
|
TE Details |
 |
Proc FC/CB/RM-0506/12
|
|
Spares for 208 KV Brown Bovery Generators |
|
TE Details |
 |
PROC-FE/CB/P&P/DKN-447/2012
|
|
TEMPERATURE, PRESSURE & DIFFERENTIAL PRESSURE TRANSMITTERS |
|
TE Details |
 |
PROC-FA/CB/P&P/UCH-0390/2012
|
|
SPARES FOR INSTRUMENT AIR COMPRESSOR |
|
TE Details |
 |
PROC-FA/CB/PROD/ CHEM-491/2012
|
|
PROCUREMENT OF 320 DRUM DEMULSIFIER |
|
TE Details |
 |
PROC-FB/CB/D-438/2012
|
|
DESANDER “DERRICK” STAND ALONE |
|
TE Details |
 |
PROC-FE/CB/ADMIN-368/2012
|
|
SPARE PARTS OF OTIS LIFTS |
|
TE Details |
 |
PROC-FA/CB/P&P/PUMP-547/2012
|
|
MECHANICAL SEALS FOR PUMPS |
|
TE Details |
 |
PROC-FE/CB/PROD-483/2012
|
|
40 TONS HYDRAULIC CRANES |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-486/2012
|
|
CARBOXY METHYL CELLULOSE LOW VISCOSITY (CMC-LV |
|
TE Details |
 |
PROC-FE/CB/PROD/ SINJ-541/2012
|
|
MOBILE WELDING PLANT |
|
TE Details |
 |
PROC-FA/CB/PROD/ PUMP-525/2012
|
|
CHEMICAL INJECTION PACKAGES |
|
TE Details |
 |
PROC-FB/CB/PROD-427/2012
|
|
6” ř PIPE LINE |
|
TE Details |
 |
PROC-FB/CB/PROD-520/2012
|
|
FLANGES, ELBOWS & PIPELINE BENDS |
|
TE Details |
 |
PROC-FB/CB/D-485/2012
|
|
CASING ACCESSORIES |
|
TE Details |
 |
PROC-FB/CB/D-492/2012
|
|
ROCK BITS & NOZZLES |
|
TE Details |
 |
PROC-FD/CB/WL-445/2012
|
|
ACQUIRING OF WIRELINE LOGGING & PERFORATION SERVICES ON CALL OUT BASIS |
|
TE Details |
 |
PROC-FB/CB/PROD-416/2012
|
|
6” Ǿ DIA PIPES FOR FLOW LINE |
|
TE Details |
 |
PROC/FB/CB/DRM-437/2012
|
|
CAMP KITS |
|
TE Details |
 |
PROC-FA/CB/P&P/DDK-0456/2012
|
|
GAS & DIESEL GENERATOR SETS |
|
TE Details |
 |
PROC-FD/CB/CORR-518/2012
|
|
HIRING IN-LINE INSPECTION SERVICES |
|
TE Details |
 |
Proc-FA/CB/PROJ/JM-406/2012
|
|
Design, Manufacturing & Supply of Fire Water Pump Package |
|
TE Details |
 |
PROC/FD/CB/CORR/454/2012
|
|
HIRING OF MECHANICAL
INTEGRITY ASSESSMENT, NDT EVALUATION AND RISK·BASED
INSPECTION
SERVICES |
|
TE Details |
 |
Proc-FD/CB/PROJ/KNR-473/2012
|
|
Extraction of LPG and NGL From GAS of Kunnar/Pashkhi Deep Plant |
|
TE Details |
 |
PROC·FD/CB/CORR/455/2012
|
|
HIRING OF CP SYSTEM'S OPERATION & MAINTENANCE
SERVICES |
|
TE Details |
 |
Proc FC/CB/PROJ/495/2012
|
|
Design, Manufacturing and supply of None API Centrifugal Motor driven pump package. |
|
TE Details |
 |
PROC-FE/CB/PROD-482/2012
|
|
RECHARGEABLE ELECTRIC CARTS |
|
TE Details |
 |
PROC-FC/CB/PROJ/SINJ-269/2011
|
|
DESIGN, FABRICATION, INSPECTION, TESTING OF HOT OIL HEATER PACKAGE |
|
TE Details |
 |
Proc-FC/CB/PROJ/413/2012
|
|
Design, Manufacturing, Supply & Commissioning of Inst Air Compressor & Nitrogen Generation Pkg |
|
TE Details |
 |
PROC-FA/CB/PROD/ ENGINE-0429/2012
|
|
DIESEL ENGINE DRIVEN GEN SET CAP:30KVA |
|
TE Details |
 |
Proc FC/CB/PROJ/477/2012
|
|
Flare System |
|
TE Details |
 |
PROC-FB/CB/PROD-385/2012
|
|
4” PIPELINE |
|
TE Details |
 |
PROC-FE/CB/P&P/DKN-430/2012
|
|
FIELD INSTRUMENTATION FOR FIRE & GAS SYSTEM |
|
TE Details |
 |
PROC-FA/CB/P&P/PUMP-499/2012
|
|
LPG INJECTION PUMP |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SIJN-467/2012
|
|
SUPPLY OF SHUTDOWN VALVES, BLOW-DOWN VALVES, SOLENOID VALVES AND LIMIT SWITCHES |
|
TE Details |
 |
PROC-FD/CB/PROD-379/2012
|
|
ACQUIRING OF SURFACE WELL TESTING SERVICES AT INCOMING OGDCL WELLS |
|
TE Details |
 |
PROC-FB/CB/D-345/2011
|
|
KELLY VALVES |
|
TE Details |
 |
Proc-FD/CB/MED-537/2012.
|
|
Hiring of Medical Services |
|
TE Details |
 |
PROC-FA/CB/C&ESS/ PUMP-449/2012
|
|
HIGH LIFT PUMP |
|
TE Details |
 |
PROC-FC/CB/ PROJ/407-A/2012
|
|
DESIGN, FABRICATION, SUPPLY & COMMISSIONING OF SALES GAS METERING SYSTEM & GAS CHROMATOGRAPHS |
|
TE Details |
 |
PROC-FC/CB/ PROJ/JM-457/2012
|
|
DESIGN, FABRICATION, SUPPLY & COMMISSIONING OF HOT OIL PACKAGE |
|
TE Details |
 |
PROC-FA/CB/DRG-462/2012
|
|
SCREEN CONES & SPARES FOR MUD CLEANER MODEL KLT-48TJB (PT) LINER MOTION |
|
TE Details |
 |
Proc-FD/CB/Proj/KRN-472/2012
|
|
Sweetening of Gas From Kunnar Pasakhi Deep |
|
TE Details |
 |
Proc FC/CB/PROJ/478/2012
|
|
Wellhead Piping Material |
|
TE Details |
 |
PROC-FB/CB/PROD-426/2012
|
|
VALVES |
|
TE Details |
 |
PROC-FB/CB/PROD-442/2012
|
|
WELLHEAD CONTROL PANELS |
|
TE Details |
 |
PROC-FB/CB/DRM-399/2012
|
|
MISC, ELECTRICAL
SPARES FOR G.E. EQUIPMENT |
|
TE Details |
 |
PROC-FE/CB/WLD-392/2012
|
|
DOWN HOLE LOGGING TOOLS |
|
TE Details |
 |
PROC-FB/CB/DRM-487/2012
|
|
02 NOS OF DRILLING RIG 2000 HP AC VFD |
|
TE Details |
 |
PROC-FA/CB/P&P/PUMP-493/2012
|
|
MECHANICAL SEALS & ITS SPARES |
|
TE Details |
 |
PROC-FD/CB/SCM-476/2012
|
|
FOR HIRING OF CONSULTANCY SERVICES FOR REVIEW OF PROCUREMENT PROCEDURES. |
|
TE Details |
 |
PROC-FA/CB/ADMIN-0157/2011
|
|
SUPPLY INSTALLATION TESTING & COMMISSIONING OF DIESEL GENSET 1100 KVA |
|
TE Details |
 |
PROC-FA/CB/PROD/ PUMP-420/12
|
|
JET PUMPING SYSTEM |
|
TE Details |
 |
Proc FC/CB/PROJ/444/2012
|
|
Utility Pumps |
|
TE Details |
 |
PROC-FB/CB/DRM-424/2012
|
|
04 NOS. OF DRILL PIPE SPIN MASTER |
|
TE Details |
 |
PROC-FE/CB/PROD/DKN-391/2012
|
|
CRANE MOUNTED TRUCK |
|
TE Details |
 |
PROC-FB/CB/PROD-384/2012
|
|
FACTORY BENDS |
|
TE Details |
 |
PROC-FB/CB/PROD-380/2012
|
|
6” & 8” PIPELINE |
|
TE Details |
 |
PROC-FE/CB/P&P/DKN-342/2011
|
|
DESIGN, SUPPLY, INSTALLATION & COMMISSIONING OF VIE NITROGEN STORAGE & VAPORIZER PACKAGE |
|
TE Details |
 |
PROC-FB/CB/PROD-471/2012
|
|
VALVES |
|
TE Details |
 |
Proc-FC/CB/Proj/JM-386/2012
|
|
Design, Fabrication, Supply & Commissioning of Skid Mounted, TEG Based Dehydration Unit |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-376/2012
|
|
CALCIUM BROMIDE POWDER |
|
TE Details |
 |
Proc-FA/CB/Proj/JM-396/2012
|
|
Design, Supply, Installation, Testing & Commissioning of 03 Gas & 01 Diesel Driven Power Generators |
|
TE Details |
 |
PROC-FB/CB/PROD-440/2012
|
|
HEAT SHRINKABLE SLEEVES |
|
TE Details |
 |
PROC-FB/CB/PROD-417/2012
|
|
THREE PHASE SEPARATORS |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-387/2012
|
|
SODIUM FORMATE & MAGNESIUM OXIDE |
|
TE Details |
 |
PROC-FD/CB/DO-351/2012
|
|
INTERNATIONAL WELL CONTROL FORUM (IWCF) CERTIFICATION COURSE |
|
TE Details |
 |
PROC-FA/CB/P&P/UCH-0390/2012
|
|
SPARES FOR INSTRUMENT AIR COMPRESSORS |
|
TE Details |
 |
PROC-FD/CB/DO-0186/2011
|
|
HIRING OF SERVICES FOR INITIAL ASSESSMENT OF BLOWOUT WELL UNDER RATE RUNNING CONTRACT ON AS AND WHEN REQUIRED BASIS |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-371/2012
|
|
POLY ANIONIC CELLULOSE-REGULAR (PAC-R) |
|
TE Details |
 |
PROC-FE/CB/P&P/UCH-266/2011
|
|
FD FAN MOTOR |
|
TE Details |
 |
PROC-FA/CB/RM-234/2011
|
|
SPARES FOR CUMMINS ENGINES |
|
TE Details |
 |
PROC-FB/CB/DRM-394/2012
|
|
MISC. ELECTRICAL SPARES FOR ROSS HILL CONTROL SYSTEMS |
|
TE Details |
 |
PROC-FA/CB/P&P/QP-428/2012
|
|
JUNCTION BOX ES FOR SOLAR TURBINE CONTROL SYSTEM |
|
TE Details |
 |
Proc. FC/CB/PROJ/JM-419/2012
|
|
Design, fabrication, supply & comm. of ICSS |
|
TE Details |
 |
PROC-FC/CB/P&P/BOC-297/2011
|
|
INSTRUMENTATION SPARES ARIEL COMPRESSOR (RIC) |
|
TE Details |
 |
PROC-FB/CB/D-346/2011 5” & 7”
|
|
LINER HANGER |
|
TE Details |
 |
PROC-FE/CB/LOG-305/2011
|
|
FORK LIFTER |
|
TE Details |
 |
PROC/FC/CB/PROJ/UCH-404/2012
|
|
Design, Manufacturing and Supply of Wellhead Utility Gas and Corrosion Inhibition Package |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-361/2012
|
|
CORROSION INHIBITOR |
|
TE Details |
 |
PROC-FE/CB/P&P/PKCP-409/2012
|
|
CABLE GLANDS |
|
TE Details |
 |
PROC-FD/CB/RMD-372/2012
|
|
HIRING OF SERVICES FOR FIELD DEVELOPMENT & RESERVOIR SIMULATION STUDY OF NASHPA GAS CONDENSATE FIELD |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-0432/2012
|
|
POTASSIUM CHLORIDE |
|
TE Details |
 |
PROC-FD/CB/HSEQ-463/2012
|
|
HIRING OF FIRE FIGHTING SERVICES FOR OGDCL HOUSE, F-8 MEDICAL CENTRE AND I-9 COMPLEX (BASE STORE, WORKSHOP, TDL, OGTI, G&R LAB) |
|
TE Details |
 |
PROC-FC/CB/PROD/UCH-353/2012
|
|
WELL HEAD CONTROL PANEL |
|
TE Details |
 |
PROC-FA/CB/P&P/CHEM-358/2012
|
|
CLAUS CATALYST |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-377/2012
|
|
ZINC BROMIDE SOLUTION |
|
TE Details |
 |
PROC-FA/CB/P&P/CHEM-357/2012
|
|
TRI ETHYLENE GLYCOL |
|
TE Details |
 |
Proc-FC/CB/Proj-0366/2012
|
|
Design, Fabrication, Supply & Commissioning of Amine Sweetening Unit |
|
TE Details |
 |
PROC-FD/CB/WS-0298/201
|
|
HIRING OF CEMENTATION SERVICES WITH CEMENT SLURRIES, PRE-FLUSHES,
CEMENTATION AND
BULKING EQUIPMENT AT
WELLS/RIGS... |
|
TE Details |
 |
Proc-FC/CB/Proj/UCH-352/2012
|
|
Design, Manufacturing, supply and Commissioning of Hot Oil Package |
|
TE Details |
 |
PROC-FD/CB/WS-317/2011
|
|
HIRING OF CENTRIFUGES UNDER RATE RUNNING CONTRACT ON AS AND WHEN REQUIRED BASIS |
|
TE Details |
 |
PROC-FE/CB/PROD-369/2012
|
|
FORK LIFTER |
|
TE Details |
 |
PROC-FE/CB/P&P/PKCP-408/2012
|
|
INSTRUMENT CABLE |
|
TE Details |
 |
DATA SHEET / PROC/FC/CB/PROJ/UCH-276/2011
|
|
SCADA AND TELEMETRY SYSTEM FOR UCH |
|
TE Details |
 |
PROC-FB/CB/D-318/201
|
|
20” CASING PIPE |
|
TE Details |
 |
PROC-FC/CB/PROJ/UCH-273/2011
|
|
Design, Manf, supply & comm of ICSS |
|
TE Details |
 |
PROC-FB/CB/PROD-383/2012
|
|
4-1/2” SEAMLESS PRODUCTION TUBING, X-OVERS & PUP JOINTS |
|
TE Details |
 |
PROC-FA/CB/P&P-370/2012
|
|
SPARES FOR COOLING TOWER GEAR BOX |
|
TE Details |
 |
PROC-FE/CB/EXPL/W-LOGG-325/2011
|
|
HOISTMAN’S PANEL & ACCESSORIES |
|
TE Details |
 |
PROC-FA/CB/P&P/ CHANDA-365/2012
|
|
GEAR BOX & RADITAOR OF REFRIGERATION PACKAGE |
|
TE Details |
 |
PROC-FB/CB/DRM-191/201
|
|
INTEGRAL UNIT OF TRAVELLING BLOCK AND HOO |
|
TE Details |
 |
Proc FB/CB/395/PROJ/JM
|
|
Design fabrication supply inspection |
|
TE Details |
 |
Proc FC/CB/ 374/Pro/UCH
|
|
Design & Fabrication |
|
TE Details |
 |
PROC-FC/CB/PROJ/UCH-350/2012
|
|
Supply of Flowline Materials |
|
TE Details |
 |
Proc-FC/CB/Proj/JM-388/2012
|
|
Supply of Emergency Shutdown Valves & Blow down Valves |
|
TE Details |
 |
PROC-FD/CB/EXPL-0309/2011
|
|
HIRING OF SERVICES FOR 3D SIEMIC DATA ACQUISITION IN BITRISM EL |
|
TE Details |
 |
PROC/FC/CB/PROJ/UCH-277/2011
|
|
INSTRUMENT AIR COMPRESSOR AND NITROGEN GENERATION PACKAGES |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-337/2011
|
|
POTASSIUM LIGNOSULPHONATE (KLS) |
|
TE Details |
 |
PROC-FD/CB/HSEQ-401/2012
|
|
HIRING OF SERVICES FOR SAFE DISPOSAL OF THE MUD PIT WASTE |
|
TE Details |
 |
PROC-FB/CB/DRM-211/2011
|
|
SWIVEL TYPE LB-500 OR EQUIVALENT |
|
TE Details |
 |
PROC-FC/CB/PROJ/UCH-274/2011
|
|
Supply of Emergency Shut Down Valves &B low Down Valves (ESDV & BDV) |
|
TE Details |
 |
PROC-FC/CB/PROJ/SINJ-270/2011
|
|
DESIGN & SUPPLY OF NITROGEN GENERATION PACKAGE |
|
TE Details |
 |
PROC-FB/CB/PROD-320/2011
|
|
26” DIA, ERW PIPELINES |
|
TE Details |
 |
PROC-FE/CB/P&P/BOBI-341/2011
|
|
STARTING MOTORS & SPARES FOR AJAX COMPRESS0RS |
|
TE Details |
 |
PROC-FC/CB/PROJ/SINJ-0268/2011
|
|
AMINE SWEETENING UNIT |
|
TE Details |
 |
PROC-FC/CB/PROJ/UCH-0279/2011
|
|
SUPPLY OF POWER GENERATION (TURBO GENSETS) WITH WASTE HEAT RECOVERY SYSTEM FOR HOT OIL. |
|
TE Details |
 |
PROC-FE/CB/RM-260/2011
|
|
WELDING PLANTS |
|
TE Details |
 |
PROC-FE/CB/PROD-327/2011
|
|
HYDRO CARBON DEW POINT ANALYZER AND ACCESSORIES |
|
TE Details |
 |
PROC-FC/CB/P&P/DKN-354/2012
|
|
FLEXI & PAUL RINGS FOR CONTACTING TOWERS |
|
TE Details |
 |
PROC-FB/CB/DRM-212/201
|
|
ALLISON
TRANSMISSION MODEL
DP 896 |
|
TE Details |
 |
PROC-FB/CB/PROD-331/2011
|
|
3-˝” SEAMLESS PRODUCTION TUBING & PUP JOINTS |
|
TE Details |
 |
PROC-FE/CB/EXPL/ ECMP-0172/2011
|
|
24-CHANNELS WEATHERING ZONE RECORDERS |
|
TE Details |
 |
PROC-FC/CB/PROJ/DKN-2587/2011
|
|
GAS POWER TURBINE AND WASTE HEAT RECOVERY UNIT |
|
TE Details |
 |
Data Sheet PROC/FC/CB/PROJ/UCH-275/2011
|
|
OILY WATER TREATMENT PACKAGE |
|
TE Details |
 |
PROC-FB/CB/DRM-204/2011
|
|
ELECTROMAGNETIC INDUCTION BRAKE |
|
TE Details |
 |
PROC-FD/CB/EXPL-0328/2011
|
|
HIRING OF SERVICES FOR NASHPA 2D SEISMIC PROJECT |
|
TE Details |
 |
Proc-FC/CB/PROJ/UCH-315/2011
|
|
Supply of Fire Fighting Equipments |
|
TE Details |
 |
PROC-FB/CB/PROD-267/2011
|
|
4” PIPELINE SEAMLESS |
|
TE Details |
 |
PROC-FD/CB/ADMIN-292/201
|
|
HIRING OF SERVICES
FOR THE OPERATION &
MAINTENANCE OF HVAC
SYSTEM INSTALLED AT
OGDCL HOUSE |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-0092/2011
|
|
PSV & BREATHER VALVES PACKAGE |
|
TE Details |
 |
PROC-FC/CB/PROD/ NASHPA-
243/2011
|
|
Valves |
|
TE Details |
 |
PROC-FB/CB/DRM-190/2011
|
|
DYNAPLEX HOOK WITH POSITIONER & SWIVEL LOCK ASSEMBLY |
|
TE Details |
 |
PROC-FD/CB/WS-0295/2011
|
|
HIRING OF SERVICES OF RTTS, CEMENT RETAINER WITH THEIR ACCESSORIES ON RATE RUNNING CONTRACT BASIS |
|
TE Details |
 |
PROC-FA/CB/PROJ/ PUMP-286/2011
|
|
CHEMICAL DOSNG PACKAGE |
|
TE Details |
 |
PROC-FA/CB/PROJ/ PUMP-285/2011
|
|
METHANOL INJECTION PACKAGES. |
|
TE Details |
 |
PROC-FB/CB/PROD-362/2012
|
|
4”, 6” & 8” PIPELINES FOR SINJHORO |
|
TE Details |
 |
PROC-FA/CB/P&P/QP-0183/2011
|
|
Spares for Cummins Diesel
Engine or Equivalent |
|
TE Details |
 |
PROC-FB/CB/DRM-216/2011
|
|
ROTARY TABLE SIZE 37-˝” |
|
TE Details |
 |
PROC-FD/CB/EXPL-0310/2011
|
|
HIRING OF SERVICES FOR MISAN 3D SEISMIC DATA ACQUISITION IN TANDO ALLAH YAR & NIM E.L |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-281/2011
|
|
API NON-TREATED BENTONITE |
|
TE Details |
 |
Proc-FC/CB/Proj/Uch-0271/2011
|
|
Design, Manufacturing, Supply & Commissioning of Gas Metering Systems and Gas Chromatograph |
|
TE Details |
 |
PROC-FD/CB/HSEQ-220/2011
|
|
HIRING SERVICES FOR PROCUREMENT, INSTALLATION, COMMISSIONING & TESTING OF CLEAN AGENT FIRE SUPPRESSION SYSTEM |
|
TE Details |
 |
PROC-FE/CB/EXPL/M-LOGG-0111/2011
|
|
MUD LOGGING SPARES |
|
TE Details |
 |
Proc-FC/CB/Proj/Uch-0291/2011
|
|
Design, Fabrication, Supply & Commissioning of Two (02) Trains of TEG based Dehydration Units |
|
TE Details |
 |
PROC-FE/CB/P&P-254/2011
|
|
Mobile Electric Welding Plant |
|
TE Details |
 |
PROC-FD/CB/ HSEQ-0265/2011
|
|
HIRING OF FIRE FIGHTING SERVICES |
|
TE Details |
 |
PROC-FC/CB/PROD/ NASHPA-242/2011
|
|
Pipe Fittings |
|
TE Details |
 |
PROC-FE/CB/EXPL/M-LOGG-
284/2011
|
|
Spares for Mud Logging Units |
|
TE Details |
 |
PROC-FE/CB/EXPL/ECMP-0261/2011
|
|
TYRES/TUBES & FLAPS FOR IVECO VEHICLES |
|
TE Details |
 |
PROC-FB/CB/DRM-236/2011
|
|
DRILL PIPE SPINNER |
|
TE Details |
 |
PROC-FC/CB/PROJ/UCH-0278/2011
|
|
TWO TRAINS OF AMINE UNIT COMBINED WITH INCINERATOR PACKAGE |
|
TE Details |
 |
PROC-FB/CB/DRM-203/2011
|
|
TORQUE CONVERTER |
|
TE Details |
 |
PROC-FB/CB/PROD-169/2011
|
|
Well Head Control Panel &
Accessories |
|
TE Details |
 |
PROC-FB/CB/PROD-224/2011
|
|
4”, 6” & 8” SEAMLESS PIPES |
|
TE Details |
 |
PROC-FB/CB/PROD-215/2011
|
|
2-7/8” SEAMLESS PRODUCTION TUBING, NECESSARY X-OVERS, PUP JOINTS |
|
TE Details |
 |
PROC-FE/CB/PROD/NP-262/2011
|
|
GAS CHROMATOGRAPH |
|
TE Details |
 |
PROC-FA/CB/PROD/ PUMP-2622/2010
|
|
Boiler Feed Water Pump |
|
TE Details |
 |
PROC-FA/CB/PROJ/ SINJHORO-
264/2011
|
|
Plant Material/Filters |
|
TE Details |
 |
PROC-FB/CB/DRM-252/2011
|
|
SPARES FOR KELLY PIPE SPINNER MODEL VARCO 6600 |
|
TE Details |
 |
PROC-FD/CB/PROD-0198/2011
|
|
HIRING OF STIMULATION & ALLIED SERVICES |
|
TE Details |
 |
PROC-FC/CB//PROD/NASHPA-
256/2011
|
|
Separators |
|
TE Details |
 |
PROC-FD/CB/PROD-0171/2011
|
|
CTU & NITROGEN PUMPING SERVICES |
|
TE Details |
 |
PROC-FB/CB/PROD/ 233/2011
|
|
TWO PHASE SEPARATOR FOR MARU RETI GAS FIELD |
|
TE Details |
 |
PROC-FB/CB/PROD-181/2011
|
|
8” LINE PIPE SEAMLESS |
|
TE Details |
 |
PROC-FC/CB/PROD/ NASHPA-257/2011
|
|
GASKETS, STUDS & BOLTS FOR NASHPA |
|
TE Details |
 |
PROC-FA/CB/PROD/CHEM-2571/2010
|
|
Micro Encapsulated Corrosion Inhibitor |
|
TE Details |
 |
PROC-FE/CB/ECMP-0214/2011
|
|
MAGNETIC TAPE CARTRIDGES |
|
TE Details |
 |
PROC-FD/CB/PROJ-0301/2011
|
|
HIRING SERVICES FOR EXTRACTION OF LPG AND NGL FROM GAS OF KUNNAR DEEP PLANT |
|
TE Details |
 |
PROC-FD/CB/RMD-0037/2011
|
|
HIRING OF SERVICES FOR SPECIAL CORE ANALYSIS OF MARU RETI GAS FIELD |
|
TE Details |
 |
PROC-FA/CB/DRILLING/ PUMP-219/2011
|
|
SPARES FOR MUD PUMP 12P-160 |
|
TE Details |
 |
PROC-FA/CB/PROJ/ CHEM-0162/2011
|
|
HEAT TRANSFER FLUID |
|
TE Details |
 |
Proc-FC/CB/PROJ/DKN-0177/2011
|
|
Skid Mounted Refrigeration Package |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0196/2011
|
|
INSTRUMENTATION SUPPLY ITEMS FOR INSTALLATION OF PIRKOH COMPRESSORS AT QADIRPUR |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-0193/2011
|
|
POLY ANIONIC CELLULOSE (LV) |
|
TE Details |
 |
PROC-FE/CB/P&P/QP-0109/2011
|
|
TEST BENCH |
|
TE Details |
 |
PROC-FE/CB/PROD-0138/2011
|
|
FORK LIFTER |
|
TE Details |
 |
PROC-FA/CB/PROD/ PUMP-0218/2011
|
|
DIESEL ENGINE DRIVEN FIRE WATER PUMP |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0153/2011
|
|
SPARES FLAME SCANNERS & PROXIMITY SWITCHES |
|
TE Details |
 |
PROC-FC/CB/P&P/ PIRKOH-0226/2011
|
|
VALVES & PIPING MATERIAL FOR PIRKOH COMPRESSION PROJECT |
|
TE Details |
 |
PROC-FB/CB/PROD-232/2011
|
|
FLANGES |
|
TE Details |
 |
PROC-FB/CB/PROJ-0168/2011
|
|
WELL HEAD MATERIAL |
|
TE Details |
 |
PROC-FE/CB/M-LOGG-0134/2011
|
|
MUD LOGGING EQUIPMENT |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-0142/2011
|
|
SILICATE DEFOAMER |
|
TE Details |
 |
PROC-FA/CB/P&P/CHEM-0194/2011
|
|
METHANOL |
|
TE Details |
 |
PROC-FA/CB/WS-0192/2011
|
|
SPARES FOR BATCH MIXERS |
|
TE Details |
 |
PROC-FC/CB/P&P/BOC-0179/2011
|
|
SPARES FOR AJAX INTEGRAL COMPRESSORS |
|
TE Details |
 |
PROC-FD/CB/DO-0230/2011
|
|
HIRING OF TUBULAR INSPECTION SERVICES |
|
TE Details |
 |
PROC-FA/CB/DRG/PUMP-263/2011
|
|
SPARES FOR MUD PUMP F-1300 |
|
TE Details |
 |
PROC-FD/CB/PROD-0200/2011
|
|
SLICK LINE SERVICES |
|
TE Details |
 |
PROC-FC/CB/P&P/ CHANDA-0125/2011
|
|
SPARES FOR MAJOR OVERHAULING OF AJAX COMPRESSOR |
|
TE Details |
 |
PROC-FB/CB/D-069/2011
|
|
CASING PIPES 9-5/8” |
|
TE Details |
 |
PROC-FC/CB/EXPL/0104 /2011
|
|
NEW SEISMIC DATA PROCESSING SYSTEM |
|
TE Details |
 |
PROC-FE/CB/PROD/UCH-0174/2011
|
|
FORK LIFTER |
|
TE Details |
 |
PROC-FA/CB/P&P/QP-0208/2011
|
|
COUPLINGS FOR WAUKESHA GAS ENGINES |
|
TE Details |
 |
PROC-FE/CB/PROD-0149/2011
|
|
40 TONS HYDRAULIC CRANE |
|
TE Details |
 |
PROC-FB/CB/DRM-0143/2011
|
|
AIR CLUTCHES |
|
TE Details |
 |
PROC-FA/CB/P&P/PK-0195/2011
|
|
FUEL GAS FILTERS |
|
TE Details |
 |
PROC-FA/CB/PROJ/ PUMP-0085/2011
|
|
FIRE WATER PUMPS PACKAGE |
|
TE Details |
 |
PROC-FE/CB/PROD-0139/2011
|
|
CRANE MOUNTED TRUCK |
|
TE Details |
 |
PROC-FA/CB/PROJ/ PUMP-0084/2011
|
|
PORTABLE WATER PUMP PACKAGE & NON API PUMPS |
|
TE Details |
 |
PROC-FA/CB/ STIMULATION-0166/11
|
|
STIMULATION CONSUMABLE SPARES |
|
TE Details |
 |
PROC-FC/CB/PROD/TOC-2594/2010
|
|
FEED GAS COMPRESSOR |
|
TE Details |
 |
PROC-FE/CB/P&P/PKCP-0132/2011
|
|
POWER & CONTROL CABLE AND GLANDS |
|
TE Details |
 |
PROC-FA/CB/ENGG-0019/2011
|
|
Electric Generators 350 KVA |
|
TE Details |
 |
PROC-FE/CB/PROD/DKN-0004/2011
|
|
DIESEL ENGINE DRIVEN WELDING PLANT |
|
TE Details |
 |
PROC-FD/CB/P&P/0165/ 2011
|
|
MAN POWER FOR ATA-2011 (BOBI AND KUNNAR) |
|
TE Details |
 |
PROC-FA/CB/PROD/ INJECTION PUMP-0140/2011
|
|
CHEMICAL INJECTION PACKAGES |
|
TE Details |
 |
PROC-FA/CB/PROD/ CHEM-0163/2011
|
|
CORROSION INHIBITOR |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-0137/2011
|
|
ANHYDROUS CALCIUM CHLORIDE (CaCI2) |
|
TE Details |
 |
PROC-FA/CB/PROJ/ SINJHORO-0103/2011
|
|
GAS/DIESEL ENGINE DRIVEN POWER GENERATORS |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-0099/2011
|
|
HEAT EXCHANGER PACKAGE |
|
TE Details |
 |
PROC-FD/CB/DO-0185/2011
|
|
HIRING OF FISHING TOOLS & SERVICES |
|
TE Details |
 |
PROC-FD/CB/ML-0064/2011
|
|
PROVISION OF MUD LOGGING SERVICES |
|
TE Details |
 |
PROC-FA/CB/P&P/BOBI-0059/2011
|
|
SPARES FOR CUMMINS ENGINE GTA-28 OR “EQUIVALENT” |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-0091/2011
|
|
COOLING TOWER PACKAGE |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-0096/2011
|
|
CONDENSATE LOADING ARMS PACKAGE |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0118/2011
|
|
PRESSURE RELIEF SAFETY VALVES |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-0092/2011
|
|
PSV & BREATHER VALVES PACKAGE |
|
TE Details |
 |
PROC-FE/CB/LOGISTICS-0054/2011
|
|
Tyres with Tubes and Flaps |
|
TE Details |
 |
PROC-FD/CB/WS-0060/2011
|
|
HIRING OF ACIDIZATION SERVICES TO RELEASE THE STUCK STRING UNDER RATE RUNNING CONTRACT ON AS AND WHEN REQUIRED BASIS |
|
TE Details |
 |
PROC-FD/CB/WS-0061/2011
|
|
STIMULATION SERVICES UP GRADATION |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-0098/2011
|
|
SCRAPER LAUNCHER & RECEIVER PACKAGE |
|
TE Details |
 |
PROC-FE/CB/P&P/PK/QP-0094/2011
|
|
FIELD INSTRUMENTATION |
|
TE Details |
 |
PROC-FA/CB/PROJ/ SINJ-0100/2011
|
|
SEPARATORS & PRESSURE VESSELS PACKAGE |
|
TE Details |
 |
PROC-FB/CB/D-032/2011
|
|
HANDLING TOOLS |
|
TE Details |
 |
PROC-FC/CB/PROJ/ SINJ-0097/2011
|
|
OILY WATER TREATMENT PACKAGE |
|
TE Details |
 |
PROC-FA/CB/PROJ/ SINJ-0095/2011
|
|
WATER TREATMENT PACKAGES |
|
TE Details |
 |
PROC-FA/CB/PROJ/ PUMP-0086/2011
|
|
API PUMPS |
|
TE Details |
 |
PROC-FE/CB/PROD-0006/2011
|
|
Pressure and Temperature Gauges |
|
TE Details |
 |
PROC-FA/CB/PROJ/ PUMP-0089/2011
|
|
CHEMICAL DOSING PACKAGE |
|
TE Details |
 |
PROC-FB/CB/PROD-922/2010
|
|
Seamless Pipe Line 4’” & 6” |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0119/2011
|
|
VALVES |
|
TE Details |
 |
PROC-FC/CB/PROJECT/SINJHORO-2588/2010
|
|
Feed & Sale Gas Compressor |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-2623/2010
|
|
Zinc Carbonate (Hydrogen Sulphide Scavenger) |
|
TE Details |
 |
PROC-FA/CB/PROD/ CHEM-0141/2011
|
|
ENCAPSULTED SCALE INHIBITOR |
|
TE Details |
 |
PROC-FE/CB/P&P/PK/QP-0115/2011
|
|
LIGHTING & EARTHING MATERIAL |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0117/2011
|
|
PIPE FITTINGS |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0120/2011
|
|
FLANGES |
|
TE Details |
 |
PROC-FE/CB/P&P/PK-0101/2011
|
|
INSTRUMENT CABLES AND CABLE GLANDS |
|
TE Details |
 |
PROC-FA/CB/P&P/PUMP-0124/2011
|
|
Produce H2O Pump with Motor |
|
TE Details |
 |
PROC-FC/CB/P&P/BOC/ 0053/2011
|
|
Shut Down Valves, Solenoid Valves, Spares for On/Off Valves |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0121/2011
|
|
GASKETS |
|
TE Details |
 |
PROC-FC/CB/PROD/ NASHPA-0127/2011
|
|
INSULATING JOINTS |
|
TE Details |
 |
PROC-FC/CB/P&P/ CHANDA-0017/2011
|
|
Tube Fittings |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0116/2011
|
|
PIPES |
|
TE Details |
 |
PROC-FB/CB/D-924/2010
|
|
Casing Accessories |
|
TE Details |
 |
PROC-FB/CB/DRM-923/2010
|
|
VERTICAL VACUUM DE-GASER |
|
TE Details |
 |
PROC-FE/CB/P&P/DKN-0022/2011
|
|
SPARES FOR CONTROL SYSTM OF INSTRUMENT AIR COMPRESSOR |
|
TE Details |
 |
PROC-FC/CB/P&P/QP-0122/2011
|
|
STUD/NUTS |
|
TE Details |
 |
PROC-FB/CB/D-044/2011
|
|
HEXAGONAL KELLY |
|
TE Details |
 |
PROC-FB/CB/PROD-0001/2011
|
|
2-7/8” Seamless Steel Production Tubing |
|
TE Details |
 |
PROC-FA/CB/P&P/PUMP-0136/2011
|
|
SPARES FOR WATER SUPPLY PUMPS (GASO, MODEL 1757/DUPLEX DOUBLE ACTING) |
|
TE Details |
 |
PROC-FE/CB/P&P/KNR-2564/2010
|
|
Flue Gas Analyzer |
|
TE Details |
 |
PROC-FD/CB/P&P/0043/ 2011
|
|
HIRING OF TECHNICAL SERVICES FOR ANNUAL TURN AROUND 2011 OF DAKHNI & CHANDA PLANT |
|
TE Details |
 |
PROC-FB/CB/D-909/2010
|
|
DRILL STRING (KELLY VALVES) |
|
TE Details |
 |
PROC-FD/CB/P&P/0130/ 2011
|
|
HIRING OF TECHNICAL SERVICES FOR ANNUAL TURN AROUND 2011 (MECHANICAL, ELECTRICAL & INSTRUMENTATION) FOR UCH GAS FIELD |
|
TE Details |
 |
PROC-FD/CB/CORR-0034/2011
|
|
Hiring of Services for “Installation & Commissioning of Cathodic Protection System” |
|
TE Details |
 |
PROC-FC/CB/P&P/ CHANDA-0027/2011
|
|
Spares for Generator, Ajax Compressor, Arial Compressor and MCC |
|
TE Details |
 |
PROC-FB/CB/D-921/2010
|
|
PDC BITS & NOZZLES |
|
TE Details |
 |
PROC-FD/CB/JV-0062/2011
|
|
Hiring of Consultancy services for Tech. and financial Audit Study…. SARA and SURI Gas Field |
|
TE Details |
 |
PROC-FC/CB/PE&FD / SINJHORO -2575 / 2010
|
|
Sale of Gas Metering Skid |
|
TE Details |
 |
PROC-FC/CB/PROD/SJN-0012/2011
|
|
Well Head Assembly Valves |
|
TE Details |
 |
PROC-FE/CB/P&P/ CHANDA-0024/2011
|
|
Digital Electronic Controllers |
|
TE Details |
 |
PROC-FD/CB/HSEQ-0057/2011
|
|
Hiring of Services for Disposal of Hazardous Waste |
|
TE Details |
 |
PROC-FD/CB/PROD-1476/2010
|
|
Hiring of Tubing Inspection Services at OGDCL Wells |
|
TE Details |
 |
PROC-FC/CB/PROD/QP-0049/2011
|
|
Pipe Fittings |
|
TE Details |
 |
PROC-FA/CB/P&P/DKN-0050/2011
|
|
Air Filters and Coalescer Filters |
|
TE Details |
 |
PROC-FB/CB/PROD-914/2010
|
|
INSTRUMENT FITTINGS |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-2604/2010
|
|
CHROME FREE LIGNOSULPHONATE (CFLS) |
|
TE Details |
 |
PROC-FB/CB/D-925/2010
|
|
7” & 5” Rotating Hydraulic Set Liner Hanger |
|
TE Details |
 |
PROC-FB/CB/D-916/2010
|
|
5" Liner Hanger |
|
TE Details |
 |
PROC-FB/CB/PROD-918/2010
|
|
Pipe Valves, Flanges, Gaskets, Elbows, Tees, Fittings & Pressure Gauges |
|
TE Details |
 |
PROC-FB/CB/D-912/2010
|
|
7” LINER HANGER |
|
TE Details |
 |
PROC-FE/CB/P&P/ CHANDA-0014/2011
|
|
MAGNETOSTRICTIVE LEVEL TRANSMITTER & GAUGES |
|
TE Details |
 |
PROC-FC/CB/P&P/ CHANDA-0016/2011
|
|
CONTROL PANEL SPARES FOR ARIAL COMPRESSOR |
|
TE Details |
 |
PROC-FC/CB/PROD/QP-0011/2011
|
|
Valves |
|
TE Details |
 |
PROC-FB/CB/PROD-913/2010
|
|
3-1/2" Tubing 12.95 Lbs / Ft L-80 & X-Overs |
|
TE Details |
 |
PROC-FC/CB/PE&FD/DKN-2591/2010
|
|
Valves & Fittings |
|
TE Details |
 |
PROC-FB/CB/PROD-911/2010
|
|
6” Seamless Pipe |
|
TE Details |
 |
PROC-FD/CB/PE&FD-0129/2011
|
|
HIRING OF SERVICES FOR INSPECTION & ANTI CORROSION COATING OF 26” & 30” PIPE LINE |
|
TE Details |
 |
PROC-FD/CB/EXPL-1416/2010
|
|
Hiring of Services for Qadirpur Data Acquisition 2-D Seismic Project |
|
TE Details |
 |
PROC-FC/CB/P&P/DKN-2592/2010
|
|
Temperature, Pressure and Differential Pressure Transmitter |
|
TE Details |
 |
PROC-FB/CB/D-927/2010
|
|
STEL WIRE ROPE |
|
TE Details |
 |
PROC-FE/CB/ENGG-2546/2010
|
|
Rough Terrain Fork Lifter |
|
TE Details |
 |
PROC-FE/CB/PROD-0029/2011
|
|
50” Bug Blowers |
|
TE Details |
 |
PROC-FE/CB/EXPL/ ECMP-2552/2010
|
|
Survey Equipment GPS, RTK |
|
TE Details |
 |
PROC-FE/CB/PROD-2612/2010
|
|
FIRE LORRIES |
|
TE Details |
 |
PROC-FB/CB/PROD-919/2010
|
|
WELL HEAD & TIE-IN MATERIAL |
|
TE Details |
 |
PROC-FB/CB/PROD-920/2010
|
|
Well Head Material (Pipe & Fittings) |
|
TE Details |
 |
PROC-FD/CB/EXPL-1473/2010
|
|
HIRING OF SERVICES FOR 2D SEISMIC DATA ACQUISITION |
|
TE Details |
 |
PROC-FD/CB/PROD-1475/2010
|
|
Hiring of Tubing (Completion) Running In—Pulling Out Services at OGDCL Wells |
|
TE Details |
 |
PROC-FA/CB./P&P/PUMP-2616/2010
|
|
Spares for Kimery Glycol Injection Pumps Model 45015 PV |
|
TE Details |
 |
PROC-FC/CB/PROD/DKN-2620/2010
|
|
Surface Facilities Material |
|
TE Details |
 |
PROC-FD/CB/DO (RIGS)-1479/2010
|
|
Hiring of Drilling Rigs (Qty. 04 Nos. Including 03 Deep Depth & 01 Medium Depth Rig) |
|
TE Details |
 |
PROC-FE/CB/EXPL/M-LOGG-2589/2010
|
|
Microscope, Trinocular Stereo Zoom |
|
TE Details |
 |
PROC-FB/CB/D-897/2010
|
|
GATE VALVES ASSYS. AND SPARES |
|
TE Details |
 |
PROC-FA/CB/PROD/PUMP-2603/2010
|
|
DIELSEL ENGINE DRIVEN JET PUMPING SYSTEM |
|
TE Details |
 |
Proc-FD/CB/P&P-1452/2010
|
|
Hiring of Services for inspection, Instalation,Supervision, commissioning and startup of Pirkoh Compressors at Qadirpur |
|
TE Details |
 |
PROC-FB/CB/D-895/2010
|
|
Diverter System 30" - 3000 PSI |
|
TE Details |
 |
PROC-FE/CB/LOGISTIC-2578/2010
|
|
Fork Lifter 5 Ton Capacity |
|
TE Details |
 |
PROC-FE/CB/STORES-2553/2010
|
|
Fork Lifter 5 Ton Capacity |
|
TE Details |
 |
PROC-FB/CB/PROD-905/2010
|
|
PIPE FITTINGS |
|
TE Details |
 |
PROC-FB/CB/PROD-904/2010
|
|
Pipe Line Accessories |
|
TE Details |
 |
PROC-FB/CB/D-917/2010
|
|
DRILL COLLAR DOPE |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-2583/2010
|
|
SHALE STABILIZER |
|
TE Details |
 |
PROC-FB/CB/PROD-910/2010
|
|
PIPELINE MATERIAL |
|
TE Details |
 |
PROC-FA/CB/WS/CHEM-2542/2010
|
|
Corrosion Inhibitor |
|
TE Details |