Civil Engineering Functions

To plan and construct site preparation works for drilling rigs comprising Rig foundation, access roads, camp utilities, water supply etc.
To supervise and construct residential camps, foundations for process plants, Store warehouses, office and technical buildings, Water treatment plants, Sewage treatment plants & metalled roads, airstrips & Production Fields development works etc.

Human Resource Base (Civil)

General Manager (C & ESS) heads the Department, having two wings, Civil and Mechanical Civil Division has three major sections: Fields, Projects and Contracts. Field Division has two Regions; Northern Region looks after all Civil work in Punjab & NWFP, while Sindh and Baluchistan are in Southern Region. The works are undertaken through Engineering Field Parties (EFP) in both the regions. About 40 qualified Engineers of different disciplines and about 400 skilled and semi skilled staff members are posted in the EFPs to undertake all types of engineering works.

 

Existing Capabilities:

The Civil Engineering set up has the capability to undertake and complete more than 30 rig sites each year, about 50,000 SFT of residential buildings, 60,000 SFT of Warehouses, about 30 Km metalled roads, can drill about 20 tube wells and are capable of handling any assignment in tough & harsh site conditions

Mechanical Engineering Functions

    • To plan and lay oil and gas pipelines, install well head assemblies.
    • To plan & execute Erection, Commissioning & ATA for Process Plants.
    • To arrange mechanical fabrications e.g. oil storage tanks, caravans, drilling mud tanks and water tanks.
    • To manage & maintain / overhaul heavy equipment / automobile at Karachi & Islamabad base workshops..

Human Resource Base: (Mechanical)

Mechanical division has three district sections: Workshop and Transport, Fabrication and Pipeline. Field working is through two Field Gathering and Construction Parties (FGCP) where about 10 qualified Engineers and about 150 skilled and semi skilled staff members are available for all kinds of Production, Pipeline construction jobs, Fabrication works and other mechanical jobs. The two FGCPs are stationed at Guddu and Tando Alam. Both the Parties are well equipped and can move swiftly to any work site through out Pakistan.

The department has met the Company Targets of the years 2007-2008. The management appreciated the efforts of officers & staff for the achievement.

 
 
 