Conditioning, treating and processing of raw natural gas/oil to obtain marketable products i.e. fuel gas, stabilized oil, motor spirit, kerosene, diesel, LPG & sulphur through processing plants via optimum safe & environment friendly process plants operation and maintenance
 

Objectives

Well fluids are often a complex mixture of liquid hydrocarbons, gas and some impurities. It is necessary to remove liquid hydrocarbons & objectionable impurities from natural gas before the gas is supplied to the buyer.
The separation/purification of natural gas, liquid hydrocarbons and removal of impurities is accomplished by various processes such as gas dehydration, gas sweetening, dew point control, LPG/condensate fractionation, liquid recovery etc. depending upon the composition of the well stream and the desired specifications of the end products.

OGDCL PROCESS PLANTS RESUME

Plant Products Design / Installed Capacity Start-up Date

Qadirpur Gas Processing Plant – gas sweetening through membrane technology.

Phase-I

Phase-II

Phase-III

 

 

Sales Gas
Condensate
Sales Gas
Condensate
Sales Gas
Condensate

 

 

235 MMSCFD
300 BPD
500 MMSCFD
900 BPD600 MMSCFD
900 BPD

 

 

1995

2004

2009

Uch Gas Processing Plant Gas Sweetening though MDEA process having low heating value gas

Sales Gas

250 MMSCFD

1999

Dhodak Gas Dehydration, unit

 

Dehydrated Gas

20 MMSCFD

2010

Dakhni Gas / Condensate Processing Plant

Gas sweetening through Amine process, LPG and Sulphur Recovery Unit


Gas Dehydration unit – train II

 

Sales Gas
Condensate
LPG
Sulphur

Sales Gas

 

25 MMSCFD
1760 BPD
26 MT/D
67 MT/D

50 MMSCFD

 

1989


2008

Bobi Gas / Condensate Processing Plant -  gas dehydration, LPG recovery and condensate stabilization

Sales Gas
LPG
Condensate

16 MMSCFD
120 MT/D
2762 BPD

2004

KPD dyhydration facility -  along with recovery of LPG through JJVL

Sales gas LPG Condensate/NGL

100 MMSCFD
dyhydration Plant
(Whereas LPG is recovered through JJVL)

2012

Chanda Gas / Condensate Processing Plant -  gas dehydration, LPG recovery and condensate stabilization

Sales Gas
LPG
Condensate

19MMSCFD
54 MT/D
5300 BPD

2004

Pirkoh/Loti Gas Compression & Dehydration Plants  - compression of low pressure gas and GAS dehydration

Sales Gas

250 MMSCFD

1987-88

NandPur Gas Dehydration Plant

Sales Gas

50 MMSCFD

2005

Sadqal Gas Dehydration Plant

Sales Gas

40 MMSCFD

2nd quarter of 1992

Pakhro Membrane Plant

Sales Gas

10 MMSCFD

2010

Hundi Sari Gas Dehydration/ Compression Plant

Sales Gas

20 MMSCFD

1975

Mela Gas Dehydration Plant

Sales Gas
Condensate

30 MMSCFD
7000 BPD

2007

Nashpa Gas Dehydration Plant

Sales Gas
Condensate

50  MMSCFD
6000 BPD

2010

Sheikhan  Gas Dehydration Plant

Dehydrated Gas

100

2010

*Gas re-injected into reservoir for pressure maintenance



 

 
 
 