spacer
Search 
 
operation
 
 
Projects
New Projects
Enhancement Projects
Future Development Projects
 

 


 
   

Future Development Projects

 
Sara West Development Project
The Sara West field, located in the Khairpur District, Sindh Province, was discovered in 1996. Previously, only one well has been drilled at the field. The field has low hydrocarbon content gas and can only be used for power generation. The field was previously operated by Tullow Pakistan (Development) Ltd. as part of the joint venture with the OGDCL. We have now taken over complete control of the field through the exercise of our pre-emption rights and drilled two additional wells as well as re-entry in the first well. Processing facilities will be installed to enrich the gas from 140 BTU/scf (standard cubic foot) to 340-350 BTU/scf (standard cubic foot). Under the plan, gas would be supplied to a power plant through a 10-inch pipeline. It is anticipated that it would take 20-24 months to develop the field once an agreement is reached with a customer for the gas.
 
Jhal Magsi Project
The Jhal Magsi field, located in Dera Murad Jamali, was discovered in 2003. It is operated as a joint venture among OGDCL (66.5%), GHPL (5%) and POL (28.5%), with OGDCL serving as the operator. The field has high contents of H2S, requiring removal before gas is injected into the transmission network. Three wells have been drilled at this field with second being a dry well. The nearest transmission lines are maintained by the SSGCL and are 75 km and 100 km away. Pipeline size and processing facilities design for the field shall be determined upon the Commerciality of the field
 
Kunnar & Pasakhi Deep Development Project
The Kunnar & Pasakhi Deep Development Project is in Hyderabad District about 25 Kms away from Hyderabad in Sindh Province. The field is being developed by installing Gas Gathering System, Liquid Separation Unit, Gas Dehydration Unit, CO2 Removal Unit, Condensate  Stabilization Unit, LPG Removal Unit and laying of 30 Kms Gas Transport Pipeline from the Plant to M/s SSGCL tie-in point. The expected production is Gas: 250 MMSCFD, Oil: 3200 BOPD and LPG: 250 MT/Day.
 
 
 
 ©2007 OGDCL - Terms of Use  

HOME  

ABOUT US CAREERS CONTACT